服务热线:021-58491386     中文 | ENGLISH
Your location:HOME > CASE > Filling solutions for dairy products
CASE
CASE
  Filling solutions for dairy products
  Oil and grease filling solutions
  Air - filled beverage filling solutions
  Soy sauce filling solutions

Installation procedure of filling machine

1.After the filling machine is opened, check whether the random technical data is complete and the machine is damaged in transit,so as to solve it in time.

2.Assemble and adjust the feed components and the material components in the form shown in this manual.

3.Lubricate the lubricating points.

4. To manually control the filling parts to check if the machine is running properly and the machine must be grounded.


Maintenance of filling machine

1.Since the filling machine is an automatic machine, the size of easy pull bottle, bottle pad and bottle cap should be uniform.

2.Before starting the machine, the machine must be manually controlled to see if it has any abnormality. if It is normal,then the machine can be turned on.

3.When adjusting the machine, the tool should be used properly. It is strictly forbidden to use too large tools or too hard to disarm parts, so as to avoid damage to machine parts or influence machine performance

4.Whenever the filling machine is adjusted, it must tighten the loose screw, and check whether the action is in accordance with the requirements,then you can turn it on.

5.The machine must be kept clean. There are no oil, liquid or glass crumbs on the machine, so as to avoid damaging the filling machine.

Therefore

(1)In the process of production, the machine can remove the liquid or glass debris in time.

(2)Clean the surface of the machine once before the shift and add clean lubricating oil to the active parts.

(3)Scrub once a week, especially in areas where it is not easy to clean or use compressed air to blow down.


8 attention should be paid to install heat shrinkable packaging machine

1.The contraction packer and the winding machine are the same because of the high power consumption, so the power of the input power must be greater than the nominal power on the nameplate of the contraction machine, otherwise it is easy to burn the circuit or the electrical components.

2. The machine must be grounded reliably to protect the personal safety.

3.Each machine is equipped with a cable connecting the power source, which must be connected correctly, the illegal operation may lead to electric shock.

4.When the machine specifies that the voltage is 3 phase 380V power supply, the zero line must be entered at the same time, that is, the standard three-phase four-wire system,other packaging equipment is also like a vacuum packing machine. Otherwise the machine will not work properly and will easily burn the internal electrical components.

5.The machine must be installed horizontally or it will shorten the service life of the electric heat pipe. In the case of a network conveyor, the tilted installation will cause the conveyor to deviate from the center.

6.When the machine is continuously used for more than three months, the thermal power line of the contraction chamber shall be checked, and according to its aging degree, the machine shall be replaced as appropriate.

7.When the machine is working, the operator is not allowed to touch the operation part of the machine, especially the temperature of the inside part is very high and it is easy to get burn.

8.After the packaging work is finished, the heating switch should be turned off,  the conveyor motor and fan motor will continue to operate for about 10 minutes and then cut off the whole power supply.

Partner 合作伙伴
ABOUT NEWS PRODUCTS CERT CASE   CONTACT

ADD: Building5,Lane9688,Puxing High way,Haiwan town,Fengxian area,Shanghai,China 

暂无备案TEL: 0086-021-58491386  50825103  61721293

  • Contact: YANG XIAOJUN    18939861221

FAX: 021-58491386

暂无备案E_mail: 2880309293@qq.com 

WEB: saifuali.com


赛车 赛车 赛车 赛车 赛车 赛车 赛车 赛车 赛车 赛车